February 2003 – Left floor, wheel well, “fillet” repair

Left floor installed (20 – 22 February 2003) This actually went quite quickly, even though our logs say it took two days. The issue was amount of time spent on each of those days. I set up a fair amount of welding, and Aaron did the welding, for the most part. As I said in Read more about February 2003 – Left floor, wheel well, “fillet” repair[…]